Exploring regenerative supplies with 3D printed marble mud
There’s a 3D printed set up on the Venice Structure Biennale 2025, and it comes from marble mud and recycled elements. The challenge, led by OZRUH in collaboration with ETH Zurich, makes an attempt to look into how structure can tackle waste utilizing modular construction and regenerative supplies. It’s a two-part challenge for the design groups. The primary one is the modular 3D printed marble mud, positioned on the Pavilion of Türkiye. The following, a documentary movie within the Synthetic part of the Arsenale curated by Carlo Ratti, the place the robots are current, too.
A concentrate on the 3D printed marble mud: it’s known as Anti-Break. OZRUH and ETH Zurich use the byproduct of the marble extraction processes on the Lasa Marmo Quarry in South Tyrol for the set up. The groups course of the mud utilizing a binder jetting methodology developed by Dr. Pietro Odaglia at Digital Constructing Applied sciences, ETH Zurich. It adopts a liquid binder to solidify the mud. The method, then, doesn’t want molds or formwork. Because of this, the groups have two columns and a horizontal slab, all of that are modular. They type the ensemble of the 3D printed marble mud.

all photos courtesy of OZRUH
Stone set up on the Venice structure biennale 2025
One of many columns isn’t linked to the slab; the consumer can alter or transfer it. The structural engineering workforce at formDP turns to computational instruments to supply it like this. The software program helped them calculate the middle of gravity and inner load paths of the slab. The rationale it’s adjustable is as a result of OZRUH and ETH Zurich wish to discover the boundaries of architectural completeness on the Venice Structure Biennale 2025. As an alternative of viewing buildings as both completed or unfinished, Anti-Break lets every building part and piece operate independently and be modular, a rising pattern in latest structure. The 3D printed marble mud set up kinds a part of the ‘Grounded / Yerebatan’ exhibition on the Pavilion of Türkiye, curated by Bilge Kalfa and Ceren Erdem, commissioned by İKSV.
Because the challenge integrates recycled supplies from quarry waste, it may be disassembled and reused. The accompanying movie on the Arsenale by Troy Edige and Beyza Mese paperwork the design, printing, and building phases. It contains footage from ETH Zurich and the Lasa Marmo Quarry. The following cease of Anti-Break is on the World Design Congress on the Barbican in London, between September ninth and tenth, 2025. This part applies the identical system to different building waste, together with crushed brick and demolition mud. On this method, the 3D printed marble mud continues as an set up that focuses on recycling and making modular elements for structure.

3D printed set up on the Venice Structure Biennale 2025 from marble mud and recycled elements

the challenge, led by OZRUH in collaboration with ETH Zurich, seems to be into how structure can tackle waste

it’s a two-part challenge, with the primary one being the modular 3D printed marble mud

the set up by OZRUH and ETH Zurich is contained in the Pavilion of Türkiye

OZRUH and ETH Zurich use the byproduct of the marble extraction processes on the Lasa Marmo Quarry











